Sunday, August 4, 2013

Straw Bales Installed! (7/2/13 - 7/10/13)




First bale set!!  
Clay Sand Straw's Kindra Welch reviewing installation procedures with crew 
and builders, Johnny Green and Jameson Ceesak
Details...

1st wall is started at east end of living room

My granddog, Oliver, is enjoying the build!
Virginia compressing and retying a bale to size
It's fun!
Kindra adding bales in living room 
Kate taking a break after 1st complete wall in bedroom

Living Room
Kate, Connie, Jamie working in bedroom




The "beast" to move the trailer with the bales and one of my first visitors!

Kindra with the "persuader" in the living room
Plywood on walls in background is part of windstorm specs
South exterior, last to be done
East exterior
North exterior

SW exterior
Sooo much straw to move out after stacking bales
Prep for rain
It's so different with walls
Closing in the south side
Almost done with bales!

Waiting to place Last Bale!
The Fabulous Crew!!



Sunday, July 14, 2013

Final preparation for straw bales

At the end of June, while "Clay and Straw" finished a project in Central Texas, we added the inside 2x4's to make the "toe-up" for the bales to sit on, built  the stairs on the south side of the house and a ramp on the north side, to move plaster up onto the porch.  Pea gravel was delivered for the toe-up, an electrician and plumber were hired and Altumaxis, my solar panel provider, was notified the metal roof would be going on in mid-July. 


Boric acid to kill bugs
Pea gravel, acts like a french drain               
Roofing felt, another layer of moisture prevention

Nails to key bales to


Roof Sheathing Goes On (6/5/13 - 6/10/13)

Plywood starts 6/5/13

Cool!

Shade!!

Spaces really start to be defined




Loft and cupola

Plywood complete 6/6/13

Underlayment goes on

Finally a roof!  Bales are next!  Yea!!

Sunday, June 2, 2013