Bayou Bay Strawbale
Natural building, straw bale building
Tuesday, January 1, 2013
Soil Testing 12/29/11
Two holes each about 25' deep, brought up soil and lots of clay.
Drilled hole with with clay shavings
Pulling the cores and labeling:
Drills packed into "drawer" under truck
Packing up
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)