Exterior Plaster / Electricity (7/23-7/29/13)

Kindra mists the clay slip prior to applying the line plaster.

Jamie and Kindra start the lime at the NE corner.

East wall with first layer of plaster.
a long way to go



The first windows are installed

While Clay/Sand/Straw crew is working outside, the electrician installed wiring and boxes.

Switch boxes and receptacles were fixed with stakes and then cobbed in place.
power to ceiling
The interior continues to have the clay slip applied.  The push was to get the outside covered with lime ASAP
This is a good example of the wires and boxes being fixed in place with the clay slip.  







The plaster continues on the outside.  The whole crew applying plaster, including my sister Carolyn!
Virgina, Kindra, Connie, Kate and Carolyn.  I bet Jamie is mixing plaster!
Jamie and Virginia, plastering the NW wall.

Johnny and Jamison installing windows, Kate and Connie plastering the south side.

North wall of living room plastered with windows installed. 

Tutorial on installing 17 ga. stucco mesh between 1st and 2nd layers of lime plaster.  Because my house is in a wind storm area near the Gulf the mesh is part of the structural package.



4" overlap at all vertical joins.


Connie attaching mesh.